kriitilise tee meetod
a method used to estimate the minimum project duration and determine the amount of scheduling flexibility on the logical network paths within the schedule model, ajakava meetod, mis lubab leida minimaalse projekti kestuse ja erinevate tegevuste ajalise vabaduse